Design

STC Approvals

Below is a list of STC Approvals where Flight Structures has acted as the Part 146 Organisation.  In some cases we retain the ownership and in others the owner is our client.  Should you require more information about any of these approvals do not hesitate to contact us.  As you will see the list is lengthy, reflecting the experience of our team.

STC no.

Owner of STC

Description

18/21E/15

Flight Structures Ltd

Piper PA-42 1000 Cabin Seat

13/21E/1

Flight Structures Ltd

Short Rear Crew Seat

17/21E/07

Flight Structures Ltd

 

High Density Seating for Kawasaki BK117 B-2

 

17/21E/20

Flight Structures Ltd

 

Main Cabin Seats for Jetstream J3202

 

17/21E/01

Flight Structures Ltd

 

Control Covers for Kawasaki BK117 B-2

 

16/21E/21

Philips Search and Rescue Trust

Installation of Medical Stretcher Base for Mitsubishi MU2B-30

 

17/21E/03

Flight Care Ltd

Adjustment of Accumulated Airframe hours of PAL CT/4E for RNZAF

 

14/21E/45

 

Heli Sika Ltd

Installation of a bicycle rack for AS350 BA, B2, B3

 

15/21E/26

Airlift Technologies Ltd

Installation of an agricultural spray system for Robinson R66

 

14/21E/17

Phoenix Aviation Ltd

Installation of a fuel transfer system to decrease unusable fuel for FU24-950/954 and FU24A 950/954 series

 

14/21E/25

Rotor & Wing Maintenance Ltd

Installation of a bicycle rack for Robinson R44 II

 

 

11/21E/18

Ravensdown Aerowork Ltd

 

Installation of a Hartzell HC-B3TN-3D/T10282NS+4 propeller for Cresco 08-600

 

14/21E/4

Flight Structures Ltd

Installation of a stretcher restraint assembly for Kawasaki BK117 B-2

 

14/21E/16

National Aircraft Interiors Ltd

Manufacture and installation of replacement upholstery, floor coverings and curtains for Fokker F27 Mk 050

 

14/21E/1

National Aircraft Interiors Ltd

Installation of replacement seat covers for Bombardier DHC-8-400

 

13/21E/45

National Aircraft Interiors Ltd

 

Replacement of passenger seat cushion foams and dress covers for Bombardier DHC-8-100, -200, -300 series

13/21E/17

Roc On Aviation

Installation of a Lycoming o-360-E2A with STC SE8987SW-D embodied in place of Lycoming o-360-D3G for Piper PA-28-161

 

13/21E/4

 

Farmers Air Ltd

Installation of hydraulically actuated flaps for PAL 750XL

 

13/21E/27

Aviation Power Supply Ltd

Installation of a camshaft pressure lubrication system for Lycoming IO-360, AIO-360, AEIO-360, HIO-360, LIO-360 Engine Models

 

13/21E/26

Aviation Power Supply Ltd

Installation of a camshaft pressure lubrication system for Lycoming TIO-540, LTIO-540 Engine Models

 

13/21E/14

Flight Structures Ltd

Installation of a reversible passenger seat for Hawker Beechcraft 1900D

 

13/21E/10

Aviation Power Supply Ltd

Installation of a camshaft pressure lubrication system for Lycoming IO-720 Engine Models

 

13/21E/9

Aviation Power Supply Ltd

 

Installation of a camshaft pressure lubrication system for Lycoming IO-540, HIO-540 and AEIO-540 Engine Models

13/21E/8

Aviation Power Supply Ltd

Installation of a camshaft pressure lubrication system for Lycoming O-360, HO-360 and LO-360 Engine Models

 

13/21E/7

BB Aviation

Installation of a medical stretcher and oxygen system for Cessna 421C

 

13/21E/6

 

Airwork (NZ) Ltd

Installation of a particle separator for Eurocopter BK117B-2

 

13/21E/5

 

Airwork (NZ) Ltd

 

Installation of LTS101-850B-2 engines for Eurocopter BK117B-2

13/21E/1

Outgro Aviation Ltd

 

Installation of an agricultural spray system for Robinson R66

 

11/21E/8

Farmers Air Ltd

 

Installation of agricultural equipment, revised engine cowl and vertical stabiliser modification for PAL 750XL

 

12/21E/3

Flight Interiors Ltd

Installation of new foam seat pads and leather seat covers for Bombardier DHC-8-315

 

10/21E/9

Willow Air (NZ) Ltd

Installation of MTV-9-B/213-22 propeller for FU24-950, FU24A-950, FU24-950M, FU24A-950M, FU24-954, FU24A-954

 

9/21E/13

Airwork (NZ) Ltd

Installation of LTS101-850B-2 engines for Kawasaki BK117B-2

 

9/21E/4

Performance Aviation Ltd

Installation of tuned exhaust system for Robinson R22 Alpha, R22 Beta, R22 Mariner

 

8/21E/20

Ravensdown Aerowork Ltd

 

Installation of an external doubler and extension of the centre wing beam service life limitation for PAL Cresco 08-600

8/21E/21

Farmers Air Ltd

Extension of the life limitations of centre wing beam and outer panel attachment fittings for PAL Cresco 08-600

 

7/21E/26

Flight Care Ltd

Introduction of an inspection program and revised airworthiness limitations for the wing external strap